Air Station Cape Cod, Buzzards Bay, Massachussets

Status

Onging

Client:

United States Coast Guard (USCG)

Project Overview:

Emmaty is delivering a design-build electrical infrastructure modernization project for the U.S. Coast Guard at Air Station Cape Cod, Massachusetts. The project involves replacing two existing 5 kV medium-voltage cutoff switches with modern distribution equipment to improve electrical reliability, operational safety, and long-term maintainability. The work includes electrical engineering, equipment installation, and system testing while maintaining operations at the Coast Guard facility.

Key Scope Highlights:

  • Removal and replacement of two existing 5 kV medium-voltage cutoff switches and associated enclosures.
  • Installation of new distribution switches with weather-resistant NEMA 4X enclosures.
  • Demolition and replacement of existing concrete equipment pads.
  • Electrical engineering, system design, and preparation of construction drawings.
  • Installation of associated wiring, electrical connections, grounding, and bonding.
  • Coordination of temporary power and planned outages to maintain facility operations.

Keywords:

Medium Voltage Electrical Systems | Electrical Infrastructure Modernization | Design-Build | Electrical Engineering | Power Distribution | Switchgear Replacement | Federal Construction | U.S. Coast Guard | Electrical Safety | Testing & Commissioning

 